{"id":837,"date":"2018-05-11T15:20:41","date_gmt":"2018-05-11T15:20:41","guid":{"rendered":"http:\/\/davidhealy.dublin13.com\/?p=837"},"modified":"2019-04-08T18:27:33","modified_gmt":"2019-04-08T18:27:33","slug":"submission-to-metrolink-consultation","status":"publish","type":"post","link":"https:\/\/davidhealy.com\/?p=837","title":{"rendered":"Submission to Metrolink consultation"},"content":{"rendered":"<p>I have made the following submission to the <a href=\"https:\/\/www.metrolink.ie\/#\/public-consultation\">public consultation on the proposed Metrolink<\/a>.\u200b<\/p>\n<p>1. Prioritise walking and cycling.<\/p>\n<p>\u200bWalking and cycling are the highest priority modes in transport policy. Logically therefore, public transport infrastructure proposals should not only not obstruct or degrade walking and cycling routes, every opportunity they present to improve permeability, safety, convenience and attractiveness for walking and cycling should be taken.\u200b Any public transport proposal such as this one should also be a scheme to improve walking and cycling in areas being served and affected.<\/p>\n<p><!--more-->1 (a) Provide \u200bwalking and cycling \u200bpermeability\u200b across the M50 motorway.\u200b<\/p>\n<p>The Alignment Options Study has ignored one of the objectives of the Fingal Development Plan.\u00a0 Appendix 1.1 Planning Context sets out Development Plan Objectives MT01, MT25, MT26 and MT28, so it is very hard to understand how MT15 has been overlooked. It reads:<\/p>\n<p>Objective MT15 \u200b\u200b<br \/>\nInvestigate and avail of the opportunities provided by new Metro North and any other public transport infrastructure to provide new cycle and pedestrian links including crossings of the M50 which currently represents a major barrier to active transport modes.<\/p>\n<p>This \u200bhas not been taken into account; the proposal should include cycle and pedestrian link(s) along the rail alignment.<\/p>\n<p>1(b) \u200bImprove \u200bwalking and cycling permeability\u200b across and along the R132 and associated roads in Swords.<\/p>\n<p>\u200bThe Alignment Options Study Appendix 1.1. Planning Context does refer to the walking and cycling permeability issues in relation to Swords. However the Study does not get into the level of detail required to evaluate the impacts.<\/p>\n<p>When detailed design is being done, it must ensure that walking and cycling are prioritised. The Swords Masterplan produced by Fingal in 2009 should be a key document in doing this.<\/p>\n<p>\u200b2 Design public transport as a network.<\/p>\n<p>The key to an effective public transport system is connectivity. Therefore this project should seek to make connections and should be evaluated for its contribution to the public transport network rather than as a stand-alone project.<\/p>\n<p>\u200b2(a) Connect the Metrolink to Donabate to integrate with the Dart\/Belfast line.<\/p>\n<p>\u200bThe Metrolink route should continue to meet the Dublin-Belfast railway line at Donabate, at either the existing station or a new station. This would allow passengers to interchange at Donabate and access destinations along the Metro route.\u00a0 This proposal has been made for many years but I am not aware of any modelling or other analysis. That analysis must be done at this stage.<\/p>\n<p>2(b) Design the \u200bM\u200betrolink to integrate with the Dart Interconnector.<\/p>\n<p>\u200bThe route should be designed to integrate with the Dart Interconnector project. The interconnector is generally agreed to be the project which will have the biggest synergistic impact on the Dublin public transport network. (It is hard to understand why it has not been prioritised.)<\/p>\n<p>The Metrolink should be designed to integrate with the interconnected Dart network. Previously the lack of capacity on the Loop Line section of the Dart has been described as a major constraint on that route. In those circumstances, it is hard to understand why Tara St. is being chosen as the interconnection point. \u200b<\/p>\n<p>Cllr.David Healy<\/p>\n<p>+353 87 6178852<br \/>\n54, P\u00e1irc \u00c9abh\u00f3ra,<br \/>\nBeann \u00c9adair,<br \/>\nCo. Bh.\u00c1.C.<br \/>\nwww.davidhealy.com<br \/>\n@davidhealyv<\/p>\n<p>&nbsp;<\/p>\n<p>Submitted to https:\/\/www.metrolink.ie\/#\/public-consultation<\/p>\n","protected":false},"excerpt":{"rendered":"<p>I have made the following submission to the public consultation on the proposed Metrolink.\u200b 1. Prioritise walking and cycling. \u200bWalking and cycling are the highest priority modes in transport policy. Logically therefore, public transport infrastructure proposals should not only not obstruct or degrade walking and cycling routes, every opportunity they present to improve permeability, safety, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[79,13],"tags":[],"_links":{"self":[{"href":"https:\/\/davidhealy.com\/index.php?rest_route=\/wp\/v2\/posts\/837"}],"collection":[{"href":"https:\/\/davidhealy.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/davidhealy.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/davidhealy.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/davidhealy.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=837"}],"version-history":[{"count":4,"href":"https:\/\/davidhealy.com\/index.php?rest_route=\/wp\/v2\/posts\/837\/revisions"}],"predecessor-version":[{"id":841,"href":"https:\/\/davidhealy.com\/index.php?rest_route=\/wp\/v2\/posts\/837\/revisions\/841"}],"wp:attachment":[{"href":"https:\/\/davidhealy.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=837"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/davidhealy.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=837"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/davidhealy.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=837"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}