The report on the Kinsealy Greenways Feasibility Study for which funding was obtained in 2017 following discussion in the County Development Plan process in 2016 has been published. It will be discussed at the Area Committee in March.
Overall, the report demonstrates the feasibility and value of providing dedicated greenway cycle routes between the towns and villages in the area.
There are a few aspects of it which I’m not clear about, and I’ll post updates when I receive them.
Kinsealy Environs – Final Report – Nov 2018
Appendix B – Existing Planning Applications-13.03.2018
Appendix C – Ecological Constraints Map
Appendix D – Tree Survey and Report
Appendix E – Architectural Heritage Map
Appendix F – Archaeological Study and Report – Cultural heritage constraints study
Appendix G – Existing Built and Natural Environment-Map